Saltar al contenido principal

Escribe una PREreview

Infrastructural Underperformance and Spillway Geotechnical Failure: A Forensic Investigation of the Gerebsegen Multi-Outlet Reservoir, Ethiopia.

Publicada
Servidor
Preprints.org
DOI
10.20944/preprints202606.2080.v2

Large-scale water infrastructure across the East African Rift System faces severe structural degradation and capacity underutilization driven by coupled hydro-geotechnical failures. This study presents a forensic engineering investigation into post-construction left-rim reservoir seepage bypass, rock-slope instabilities, and spillway design and construction deficits at the multi-purpose Gerebsegen Dam in northern Ethiopia, positioning the findings within the macro-regional discourse on East African dam safety paradigms. Engineered with a 30-year design period to provide municipal water to Mekelle city and irrigation purposes, the project exhibits a critical discrepancy between chronological age and operational efficiency. Although 12 years have elapsed since construction, the reservoir utilizes only 20% of its design storage volume. This deficit has neutralized two of the system’s three pressure conduit outlets, completely abandoning the 500-hectare irrigation supply and a secondary 250 lit/sec municipal line. Consequently, operational yield is restricted to the primary municipal pipe, which delivers only 150 lit/sec due to severe pump downtime despite a 250 lit/sec design capacity. To isolate the root failure causes, geotechnical site characterization and a hydrogeological mass-balance model were deployed. Geotechnical investigations using core drilling and Electrical Resistivity Tomography (ERT) revealed that the reservoir’s left abutment rim is heavily fractured by tectonic joint networks and cross-cut by highly permeable, weathered dolerite intrusions. This deficient geological boundary condition permitted high hydraulic gradients to drive a massive lateral subsurface short-circuiting seepage bypass of 568 lit/sec out of the storage basin. Crucially, this structural bypass is continually masked by a perennial upstream river baseflow contribution of 372 lit/sec, resulting in a net observed reservoir drawdown rate of approximately 373 lit/sec. Furthermore, kinematic slope stability assessments identified severe structural vulnerabilities along the reservoir rim and spillway chute channels, where excavated rock slopes are cut at unstable, near-vertical angles of 75° to 80°, and triggering block failures. Hydraulic reassessments also confirmed that the existing spillway is significantly under-poor construction, failing safely to pass extreme peak flood discharges. These findings establish a vital diagnostic workflow and highlight the necessity of coupling rock-mass slope forensics with hydrogeological mass-balance modeling to design resilient abutment cutoff systems in fractured rifts. To mitigate these structural risks, a regional-standard remedial engineering package is evaluated, featuring a structural replacement with a rigid, tapered cantilever reinforced concrete structure up to 7.20 m high, a 1,700.50 m3 upper-slope offloading excavation to a stable 45° profile, and a subsurface pressure-grouting curtain.

Puedes escribir una PREreview de Infrastructural Underperformance and Spillway Geotechnical Failure: A Forensic Investigation of the Gerebsegen Multi-Outlet Reservoir, Ethiopia.. Una PREreview es una revisión de un preprint y puede variar desde unas pocas oraciones hasta un extenso informe, similar a un informe de revisión por pares organizado por una revista.

Antes de comenzar

Te pediremos que inicies sesión con tu ORCID iD. Si no tienes un iD, puedes crear uno.

¿Qué es un ORCID iD?

Un ORCID iD es un identificador único que te distingue de otros/as con tu mismo nombre o uno similar.

Comenzar ahora