Saltar al contenido principal

Escribe una PREreview

From Building Services to Process Loads: Whole-Building Utility-Calibrated Simulation of Operational Decarbonisation Limits in a UK Restaurant Retrofit

Publicada
Servidor
Preprints.org
DOI
10.20944/preprints202606.0559.v1

Restaurants combine long opening hours, catering demand, kitchen ventilation, DHW and mixed-fuel cooking loads, making their decarbonisation different from generic commercial retrofit. This single-case study develops a whole-building utility-calibrated OpenStudio/EnergyPlus model for Beit El Zaytoun, a 655.82 m² restaurant in Park Royal, London. Monthly electricity and gas data for June 2024–May 2025 were used to anchor the baseline at whole-building level. Standalone and cumulative scenarios tested insulation, low-emissivity double glazing, LED lighting and controls, ASHP service scenarios and an 11 kWp PV array. Baseline demand was 413,895 kWh/yr, equivalent to 631.1 kWh/m²·yr and 75,020 kgCO₂e/yr. The best building-focused package reduced net imported energy to 314,734 kWh/yr and operational carbon to 56,700 kgCO₂e/yr, a retained 24.0% reduction on the source reporting basis. The model-derived residual process load, kitchen and catering gas plus kitchen and back-of-house electricity, remained 233,920 kWh/yr across building-focused scenarios. The Residual-Load Index (RLI) rose from 0.57 to 0.74; with ±15% process-load allocation uncertainty, the optimised RLI range was 0.63–0.85, so the post-retrofit balance remained process-load dominated. The case demonstrates a practical decarbonisation ceiling likely to recur in similar high-process-load hospitality premises: fabric, lighting, heat electrification and PV are necessary but insufficient without catering-equipment, cooking-fuel, kitchen-ventilation, refrigeration-control, sub-metering and demand-response strategies. The paper contributes whole-building utility-calibrated quantitative evidence and a transferable RLI metric for sub-sector-specific retrofit policy.

Puedes escribir una PREreview de From Building Services to Process Loads: Whole-Building Utility-Calibrated Simulation of Operational Decarbonisation Limits in a UK Restaurant Retrofit. Una PREreview es una revisión de un preprint y puede variar desde unas pocas oraciones hasta un extenso informe, similar a un informe de revisión por pares organizado por una revista.

Antes de comenzar

Te pediremos que inicies sesión con tu ORCID iD. Si no tienes un iD, puedes crear uno.

¿Qué es un ORCID iD?

Un ORCID iD es un identificador único que te distingue de otros/as con tu mismo nombre o uno similar.

Comenzar ahora